Solution

Your Own Brand Without Owning a Factory

Differentiation is the whole game in DTC. Colour, print, finish, packaging and bundle are all changeable without a new mould.

A DTC brand lives or dies on not looking like a marketplace commodity. That does not require a new product — it requires owning the surface, the colour, the packaging and the story. We let a brand change all four on an existing mould: a printed pattern instead of plain black tube, a custom colour and finish, retail packaging with the brand’s own artwork, and a product bundle designed for the brand’s actual customer. The first order can be small, so the design decision is tested against real customers before it is scaled.

Where DTC differentiation usually comes from

  • Surface pattern and colour rather than plain tube
  • Packaging that reads as a consumer product, not a medical device
  • Bundle design around a customer story
  • Weight and fold-down behaviour as a customer experience

What we need to quote

The customer, the price point, the bundle and the launch date. A DTC timeline is usually driven by photography and content, so the product needs to arrive before the content does.

FAQ

Questions buyers ask

Can you do small runs for a DTC launch?
Yes — 200 pieces for a colour or printed pattern on an existing mould.
Can you match our brand colours?
Send the reference and we will confirm against the actual finish, because screen swatches lie.

Ordering facts, before you ask

Legal entity
Guangdong Jinda Rehabilitation & Nursing Products Co., Ltd.
Factory location
Nanlang, Zhongshan, Guangdong, China
Facility
24,000 m² facility
Years manufacturing
16 years
Order paths
ODM from existing moulds · OEM to your drawing or sample
MOQ — stock model
50 pcs (existing model, your branding)
MOQ — colour or print change
200 pcs (existing mould, changed colour / printed pattern)
MOQ — new tooling
1,000 pcs (new mould or new structure)
Sample lead time
7 days
First order
15–20 days from production scheduling (stock models ship same day)
Repeat order
7–10 days
Payment
T/T · Trade Assurance
Certifications
ISO 9001 · ISO 13485 · CE documentation · FDA establishment registration
Packaging
Retail, marketplace/FBA and bulk packaging — built into the order, not added later
Spare parts
Long-term supply commitment for institutional and retail buyers
Shipping
FOB / CIF from South China, by sea or air

MOQ applies per SKU, not per purchase order — a three-product launch is three minimums. Certificate numbers are published on the certifications page so your importer can verify them with the issuing body.

Get the price list and MOQ sheet

One email. Material options, MOQ by product line and the tooling position — no obligation.