Walkers & Rollators
Folding walkers and rollators in aluminium and carbon fibre, including seat, armrest and step-grip configurations. Carbon fibre reduces both the weight a customer holds and the weight you pay to ship on every unit.
Aluminium → carbon fibre
Most of this category is still built to a price that only works if the tube is the cheapest option available. That decision shows up two years later — in rust, in wobble, in a one-star review that costs more than the saving.
Aluminium for price bands, carbon fibre for freight.
- Frame: Aluminium or carbon fibre
- Configuration: Standard, folding, seat and step-grip models
- Folding: One-hand fold and lock
- Customisation: Print, colour, grip and tip type, packaging
- MOQ: 50 pcs stock · 200 pcs colour/print · 1,000 pcs new tooling (confirm by design)
- Lead time: Sampling 7 days · first order 15–20 days · repeat 7–10 days (confirm by order)
Where it ships
- Marketplace & e-commerce
- DTC brands
- Global trade
- Nursing homes
How we customise
- Material and wall thickness
- Colour, pattern and logo printing
- Retail / FBA packaging and bundling
- Spare parts and repair kits
What we need from you
- Target market and channel
- Target retail price (this decides the material)
- A sample, drawing or competitor link
- Any certification your importer requires
Walkers & Rollators — production models
Model numbers below are real production models. Tell us the model and the market and we will confirm the MOQ tier, the material and the packaging position.
More walkers & rollators from the product brochure
Additional configurations shown in our printed catalogue (p17–p22) — motorised-free, folding, bariatric and FBA-size variants included. Ask for the model code in your enquiry.
Ordering facts, before you ask
MOQ applies per SKU, not per purchase order — a three-product launch is three minimums. Certificate numbers are published on the certifications page so your importer can verify them with the issuing body.
Get the price list and MOQ sheet
One email. Material options, MOQ by product line and the tooling position — no obligation.