Factory

Nanlang, Zhongshan. Come and look.

A factory page is a claim. A live walk-through is evidence. We do both: here is what is on the floor, and a standing offer to walk it live on a video call during working hours.

Tube & frame

Laser cutting, bending, automated welding. The geometry that decides whether a frame wobbles in year two.

Injection & forming

Our own plastic injection line for seats, backrests and hardware; carbon fibre forming, curing and drilling.

Printing & testing

In-house pattern and logo printing, static load and salt spray testing before a shipment leaves.

Book a live walk-through

Ask for a video call in your enquiry and we will agree a time (GMT+8 working hours). Bring the product you are trying to build — that is what we will walk you past on the floor.

Arrange a visit

Ordering facts, before you ask

Legal entity
Guangdong Jinda Rehabilitation & Nursing Products Co., Ltd.
Factory location
Nanlang, Zhongshan, Guangdong, China
Facility
24,000 m² facility
Years manufacturing
16 years
Order paths
ODM from existing moulds · OEM to your drawing or sample
MOQ — stock model
50 pcs (existing model, your branding)
MOQ — colour or print change
200 pcs (existing mould, changed colour / printed pattern)
MOQ — new tooling
1,000 pcs (new mould or new structure)
Sample lead time
7 days
First order
15–20 days from production scheduling (stock models ship same day)
Repeat order
7–10 days
Payment
T/T · Trade Assurance
Certifications
ISO 9001 · ISO 13485 · CE documentation · FDA establishment registration
Packaging
Retail, marketplace/FBA and bulk packaging — built into the order, not added later
Spare parts
Long-term supply commitment for institutional and retail buyers
Shipping
FOB / CIF from South China, by sea or air

MOQ applies per SKU, not per purchase order — a three-product launch is three minimums. Certificate numbers are published on the certifications page so your importer can verify them with the issuing body.

Get the price list and MOQ sheet

One email. Material options, MOQ by product line and the tooling position — no obligation.