Manufacturer

Grab Bar, Footrest & Spare Parts Manufacturer

The small components that decide a return rate, and the spare parts that keep a customer after year one.

Small parts are where warranty costs hide. A sealing ring that is 0.5 mm too thin, a wall thickness reduced to save a few cents, a bolt bagged loose so it migrates inside the box — each of those turns into a return that costs far more than the saving. We manufacture grab bars, anti-slip mats, footrests and replacement components, and treat them with the same tooling discipline as the main product. Spare parts supply beyond the first order is a standing commitment rather than an exception, which is what institutional buyers actually need.

What we manufacture

  • Grab bars and support rails
  • Anti-slip mats and pads
  • Footrests and step stools
  • Replacement tips, pads, plugs and hardware

Why it matters

A missing bolt reads as a quality problem regardless of how good the frame is. Packaging and small-part design are quality work, not logistics work.

FAQ

Questions buyers ask

Can you supply spare parts long term?
Yes — replacement parts are a standing supply item for institutional and retail buyers.
Can parts be branded or bundled?
Yes. Parts and accessories can be retail-packaged or bundled with a main product.

Ordering facts, before you ask

Legal entity
Guangdong Jinda Rehabilitation & Nursing Products Co., Ltd.
Factory location
Nanlang, Zhongshan, Guangdong, China
Facility
24,000 m² facility
Years manufacturing
16 years
Order paths
ODM from existing moulds · OEM to your drawing or sample
MOQ — stock model
50 pcs (existing model, your branding)
MOQ — colour or print change
200 pcs (existing mould, changed colour / printed pattern)
MOQ — new tooling
1,000 pcs (new mould or new structure)
Sample lead time
7 days
First order
15–20 days from production scheduling (stock models ship same day)
Repeat order
7–10 days
Payment
T/T · Trade Assurance
Certifications
ISO 9001 · ISO 13485 · CE documentation · FDA establishment registration
Packaging
Retail, marketplace/FBA and bulk packaging — built into the order, not added later
Spare parts
Long-term supply commitment for institutional and retail buyers
Shipping
FOB / CIF from South China, by sea or air

MOQ applies per SKU, not per purchase order — a three-product launch is three minimums. Certificate numbers are published on the certifications page so your importer can verify them with the issuing body.

Get the price list and MOQ sheet

One email. Material options, MOQ by product line and the tooling position — no obligation.